RSS Feed for This PostCurrent Article

Chula Vista Week 2 Update

Walk through with me and see our progress. We got alot done in the first 2 weeks including creating a great open concept floorplan downstairs and new private master suite space up top. These small details outside with the knee braces and pergola over the garage will dramatically change it from a standard stucco box to something more leaning Coastal California Craftsman. The exterior paint is coming next, I’m really torn with this body color choice you can see┬áthe samples up on the wall.

Trackback URL

Post a Comment