I Love the Smell of PVC Glue in the Morning

Saturday morning the plumbers beat me to the punch. I got there at 8 and there were already 6 guys all over the place and a strong odor of PVC glue in the air. My plumber brought in a new construction crew and they roughed in the whole house with a complete new system in 1 day! Monday he’ll run the new gas line and we’ll call in for an inspection Tuesday. This week I also opened up 3 interior walls creating more of an open floorplan, doing a different kind of arch this time with square corbels on the bottom. Monday the roofers finished and he apologized for trying to raise the price on me? o.k… I also wrapped the house with Tyvek and installed all the dual pane vinyl windows after they arrived midweek. I remember about 10 years ago putting in my first set of retrofit vinyl dual pane windows in my personal home, a buddy of mine who is actually a general contractor told me not to ever use foam because it would cause the windows to warp when the foam expands. This was in San Diego where it’s always 75 and sunny and probably wouldn’t matter but here in Texas it’s the code and the homebuilders foam everything including the new construction windows inside before the drywall goes in. You want to create a tight envelope in order to be more energy efficient. With these new windows, a high efficiency A/C, roof vents and new insulation in the attic the future homeowner will benefit greatly with a low power bill. Our buyer of the Hat Trick House next door has a electricity bill in the $100’s while most other original homes in the area are paying around $300/month. Hey don’t get me wrong; I love original sashed historic windows with wavy glass, but not at $300 per month. While doing the new windows I also went ahead and also redid the wood trim because for the cost and labor saved in stripping and sanding, my paint job will come out killer now. Next up to bat will be getting HVAC and Electrical sub-contractors through the house, we’ll see who I can corral this week. We are moving at a really nice pace, I’ve scheduled it so I can be doing projects while the subs are busy without getting in their way.

Milking the Clock

We had a big week 3 on the Neighbors House project. Monday I passed inspection for my foundation so we ordered materials and went straight into framing the master suite room addition Wednesday. When laying out the floor joists I had the option to grab an extra 15 square feet by not cutting down my 16 footers and additionally we cantilevered the sills out and ended up with extra footage along the rear thus making our addition just over 700 s.f. instead of the planned 620. The framers kicked ass and got it done in a day and a half. I also had the stucco guy do the column bases for the front porch during the week. For the roof I went with my favorite 30-year composite shingle but since there were “Estate Grey” roofs on either side of this house (one being Hat Trick House) I had to choose another color, Driftwood. It’s really bizarre to flip two houses right next door to each other. Not only will I get to use my sales comp but also get the carryover curb appeal. My roofers showed up Friday and really got off to a slow start, it’s really disappointing to see someone intentionally dragging something out. Turns out the workers were being paid a day rate instead of a contract rate. After turning up the heat on my subcontractor he quickly changed their pay scale to per square pricing and they really started working, it was like I was looking at a different crew. These clock milkers had the nerve to ask me to buy lunch for them Saturday, I told them where they could go… to find the closest taco shop. The roof didn’t get finished due to the time lost so they’ll be back Monday to wrap it up. This week I’ll take care of the interior framing and arched openings and then its time to run the sub contractors through there for HVAC, electrical and plumbing to work towards the big milestone of passing rough-in inspections on all 3 of these trades.

Week 2 Update Neighbors House

After completing the bulk of the demo last week my main goal has been towards getting the new roof on. I always start with the new roof first (and foundation if needed) on any major remodel so if there were any leaks previously it wont trash any new stuff going in. Before I can get the roof on this house, I have to add the porch and room addition so it’s been my main focus to get these taken care of first. I had to move the gas meter back 40 feet from the house but luckily the power company showed up Monday and obliged so I got started with no delay. The porch came out really good as it completely changed the look of our house. In this historic neighborhood everyone loves the big front porches and they are an important feature in order to maximize retail sales price. I mimicked the original house design with the 30” eaves and open rafter tails. There are about 10 different Craftsman style home models in our neighborhood but unfortunately this one doesn’t come with the traditional porch so we knew we had to add it. The rear addition is the major change of this house, it will be approximately 620 square feet and contain a utility room, master bedroom, master bath, hallway and walk in closet. Once again to obtain maximum retail sales price these are things that today’s buyer will expect. We will also be giving them a walk-in food pantry and double vanities in the bath, all popular amenities to consider when given the opportunity to remodel. I was fortunately able to design around the big pecan tree so after we are done I plan to do a cool deck around the tree with a circular bench and French doors leading from the master suite. We’ve gone through 6 dumpsters so far, 3 being filled with dirt from the excavation I had to do with the Bobcat for the addition. Monday I have an engineer inspecting my foundation and issuing a certificate, which the City of San Antonio requires for our permit and then we’ll be free to start framing. Do you want to learn exactly how someone pulled down $155,510 his first year Flipping Houses in a recession? Visit our friend’s blog and see. Congratulations bro!

The Neighbors House

Yes, we are flipping the house right next door now! Scope of work video…

Taking Care of Business

I had a big week on the project. Monday morning I dragged the whole family up to Ikea in Austin to buy the cool farmhouse sink for $299. After getting back I went and picked up 6 pre bull-nosed granite slabs and with the help of a friend we got all the countertops installed by 11 pm. This is the way to do your granite counters for about $10/s.f. I used the color Verde Butterfly this time. I had to alter my sink base cabinet to accept the farmhouse sink from Ikea but with some simple cutting out on the front and back it fit perfectly. I also got all the bathroom sinks and faucets in and the hot water heater installed. The A/C guy finally showed up and installed the condenser so we can call in for HVAC final inspection this week. We started sanding the hardwood floors Friday and I was pleased to see that most of the problem areas are disappearing. Once we come back with the dark Walnut stain they should end up looking fantastic. The wrought iron driveway gate is also installed now and adds a great touch. The floor refinishing guys will work through next week, while I switch gears to the landscape. My “Coming Soon” sign is in the yard now so stay tuned.

Post-Mud Walkthrough

All the tape and float is now complete and the whole house got textured today with a light orange peel. This crew did a great job and the house looks incredible. The texture guy was checking out my cactus in the front yard so I had to keep an eye on him. We ordered 13 pre-hung interior doors at roughly $68.00 ea. this week so they will get delivered Tuesday and I can start hanging them. I chose a raised 2-panel hollow core with oil rubbed bronze hardware, which we will use throughout the house. A nice young couple has been by several times looking at the house and found me through a friend who lives on the next block. They are extremely interested and love the area however I think we might be priced a bit out of their range. It’s amazing how hot this area is and what little good inventory comes up. Most of the houses in Mahncke Park are 2/1’s with tiny closets and not fully updated so our 3/2 with luxurious master suite will be a very unique offering and timely to coincide with the surging popularity of the area. Here is a quick walkthrough video from today.

Hat Trick All Framed Up

Walk through with me and check out my framing…this is how we roll.

Initial Walkthrough Hat Trick

Scope of work…follow along baby! some crazy reconfigurin’ goin’ on ’round hur’

Its Done!

It’s Done! Last week was crazy, tons of small items to finish and 14-hour days but I finally arrived at completion last night. It’s been a fun 3 months and it’s quite rewarding to look at the before and after pics and remember what we started with. You can also watch the full video here if you care to see a more in depth look at the rehab steps we went through.  We’ll keep you posted on this project throughout the offer and sale process. We’ve priced it at the top of the market so this should be interesting. Stay tuned…

Craftsman Bungalow Mahncke Park