I had my first theft at the jobsite this week, someone came in the backyard after hours and stole my 45 dollar extension cord. Since it’s been raining all week the thief left some good footprints when he tracked mud onto the driveway. I’ve taken photos, made castings and measured the prints and concluded the perp is a size 8. This happened the night before I installed the exterior doors and locks so we’re Fort Knox now if he decides to come back for a second helping of construction materials. My bad for leaving it out anyway. Before the rain started this week I got all the #117 siding on the room addition and the front of the guest house, also building a cool balcony deck. The rear unit is turning out swell and will make someone a great rental unit, granny flat or at home office space.

 Master Suite Addition

Guest House

 I failed my mechanical rough-in inspection this week due to multiple small items that my sub-contractor overlooked. They left off a little insulation on the copper and also drilled through the furnace exhaust vent with a small screw when strapping it in the attic. Additionally they “forgot” the secondary overflow from the drip pan under the coil. It’s hard for me to believe he can still keep failing inspections for basic stuff as we’ve gone through this so many times and he knows what needs to be in place to be legit and pass. I never saw him personally in the attic during the job…maybe that explains it. The inspector also called me out for my placement of the dryer vent from the laundry room. The V in HVAC stands for ventilation. When he comes to inspect the rough-in of new heat and a/c equipment he also looks at the dryer and hot water heater vents even though my a/c sub-contractor has nothing to do with these items. I have the dryer vent placement about 2 feet from the back door and he said it is a fire hazard to leave it that close. It needs to be a minimum of 3 feet from any opening to meet code, chalk that one up to another learning experience. Also, keep your dryer vents clean, there is a serious fire risk from lint build up and it reduces energy waste. I also handled the hall bathroom subfloor on Friday and set the tub Saturday morning.

Master Suite Framing

Bathtub

After my regular electrician burned me on the last project I was back to square one getting bids from new guys. 3 out of the 4 bids were twice as much as I usually pay. I ended up finding a good price from my plumber’s referral and the guy rocks, literally. This master electrician is also the lead singer in a local San Antonio Judas Priest cover band called Sad Wings of Destiny. He can hit Rob Halfords’ lyrics note for note. Still waiting for him to bust out while we are working.