It was nice to get in a full week on the project now that the other house sold. I finished up the front porch by making new stairs and replacing the siding skirt where needed. We got a comment from Mike asking what I was going to do about the column base overhanging the porch floor, I’ll just have to live with it as its only over by a few inches and doesn’t strike me as really looking that odd since they overhang the top too. The posts that hold up the porch are existing 6X6’s. Their placement was really far out to the corners so in order form me to have the tapered columns I had to have the bases hang over the floor a bit. If I had gone back with just square posts I don’t think it would look as cool so I’ll live with it. The 16 degree flare on the skirt looks real cool with the 117 siding.
My firebox arrived this week as well so I got to install it. Of course the dimensions I got online for the rough-in framing hole didn’t work out so I had to reconfigure this wall a bit on the fly. It’s a double sided see-thru gas fireplace that I’ve put between the jacuzzi tub in the master bath and the master bedroom. Locally you’d spend $5,000-$8,000 for something like this even at a wholesale builders supply so I was excited to find them online for $1295.00 from Ebay/Discount Fireplace Outlet. With the vent pipe and everything you need, the total including tax and delivery was about $1800.00. It’s easy to put in, once you have the box framed in there’s just one gas line that I’ve got coming in underneath and then the vent through the roof. The unit doesn’t need electrical as there’s an ignitor and low voltage switch that you mount on the wall. This is a real cool feature for what I spent, we’ve designed the whole master suite around it, can’t wait to see it with all the tile around it and the 6′ tub in.
I found a new HVAC guy last week who’s already got started roughing-in my new 5 ton central air/heat system. It’s a horizontal gas furnace of course (electrical is not smart energy) with a A-coil like I always use. Since this house is so long we’ve got a real long supply trunk line with 11 drops and 3 return air grills. Yellow Page retail prices in San Antonio for a total new install like this would run over $2,000/ton, or $10,000. My regular sub-contractor was bidding $6,500.00 for this house which equates to $1,300/ton. Like I’ve mentioned before, it’s common to experience price creep with subs, you always have to keep hammering them or switching because they slowly raise their prices on you. So here’s the good part; my new guy is only charging me $4400.00 complete. That’s only $880.00 per ton my friends! I’ve already turned him on to another investor friend of mine, this guy is hungry for work and I saved over $2k by shopping around and walking away from old faithful. In my business any savings along the way goes straight to the bottome line.
San Antonio Home Sales of single family residences were up 20% in April when compared to the same month in 2009. Great news but undoubtedly this is directly reflective of the Federal Tax Credit that’s now expired. In typical cheerleader fashion, the San Antonio Board of Realtors has come out to predict “these home sale increases should hold through the Summer” although I have different thoughts..especially knowing that mortgage applications are taking a dive in May.
Hi, good post. I have been thinking about this issue,so thanks for sharing. I will definitely be coming back to your blog.