Primed & Ready

Primed & Ready

After 5 days of prep on the Hat Trick House I finally got the outside in primer last weekend. Just in time before this week’s 4-day rainstorm hit. It looks great, can’t wait to see some color on it.

My wife and I are considering an olive drab body color with cream trims and plum accents. The A/C is all roughed in now so we will be calling for inspection shortly. The plumbers are finally now working on roughing in the complete new system including water supply, waste and gas lines.

There will be no trace of any old mechanical system in this house when we are done. Although the market has slowed way down this year we are happy to see 2 more houses go under contract this week within blocks of our house.

Despite the troubling economy and all the bad press in the media, people still need houses to live in and this area we have been investing in is hot. Additionally, we are getting random potential buyers from the neighborhood stopping by asking when the house is going to be ready.

The word is out that I am doing this rehab as we have developed quite a following in Mahncke Park, everyone loved our last remodel one block over, the Craftsman Bungalow.

Screens

Electrical Inspection: Passed

Electrical Inspection: Passed

This week we had our electrical inspection for rough-in and passed. The inspector that came out was the same guy who did our last rehab house one block over and complimented us on the good work being done.

I really felt guilty for taking out the original sashed, leaded glass windows after seeing all that white vinyl earlier this week. It had to be done though as they were in such bad shape and with tons of cracked panes.

Additionally, with the room addition having new dual panes it just made sense on this house. To redeem myself with the historical gods I spent 2 days remaking wooden original replica hanging window screens.

I designed them in such a way to minimize the appearance of the white vinyl. They came out sweet and will be an important accent feature of the exterior paint job coming up soon.

I used 1×2 and 1×3 Poplar hardwood and pre-drilled, screwed and glued them. I also used the historically correct screen hangers still available from Stanley. After the screens are painted I’ll stretch the mesh behind the frames.

Screens

I also installed the pre-hung back door to the kitchen and went ahead and replaced the siding around it since I had extra left over. These pre-hung units are really easy to install, any DIY’er can tackle this project. Finally, I installed the French doors to the master bedroom so now the house locks up good at night.

New Back Door

Many of our regular visitors remember the wholesale deal we offered last summer called Bungalow 2. We sold it to another investor and he quickly rehabbed it with a full crew. He did a nice Ikea kitchen with granite and stainless and added a master bathroom on it as well. After being on the market only 44 days we saw that it just went under contract. Here’s how the house looks now after his rehab.

Bungalow 2 Rehab

The Old and the New

The Old and the New

T 117 siding

As you can see I have the whole house sanded down and the new windows are in. I did all 30 windows in 1 day by myself. It’s looking really good now and it’s easy to imagine how it looked in bare wood form circa 1925 with a possible Model-T parked out front.

Looking in the near distance you can see the new 20-story luxury upscale condo building called The Broadway that’s being built just 2 blocks away. It’s the largest scale condo high-rise in San Antonio and the most expensive coming in at $500 per square foot.

The San Antonio Riverwalk Extension will reach 2 blocks away from this high-rise and our property as well. This area of Broadway will become quite swanky in the next 3-5 years with the addition of this high-rise and more on the table.

We are in good company with the builder, Mr. Red McCombs who is also betting on this area as being a good investment. Mr. McCombs is supposedly keeping the top floor for his private use while the 19th floor is comprised of two penthouses at 4 million each, one of which is already sold.

Electrical Wiring

The complete electrical is also now roughed in. All we have to do is set the meter loop next week and then we can call in for rough inspection. I hired and fired a plumber this week as well, after talking him down to the price we needed he dropped off his materials and disappeared for 4 days.

He begged me to give him another chance and explained how badly he needed the work, I could only keep asking myself why wouldn’t he show up and do it then? If it’s this hard to get him over to do the rough-in then we could really be in a jamb when inspections started…better to clip this guy now.

Of course we didn’t give him any money up front so we haven’t lost anything but time. The HVAC guys have started running all the ductwork for the new central A/C I’m adding. I’ve located the furnace and coil in the attic to save space.

I am using a 4-ton, 14 seer Goodman system for this house. They recommend roughly 1 ton for every 500 s.f. of living space. Prices in San Antonio for a system like this with all new equipment, ducts, grilles, boxes and permits run about $5,000.

Keep in mind this is a builder price; retail companies from the phone book would be quoting $8-10k easy.

New Siding

I got the siding on this week as well. I used the “historical replica” #117 siding for the whole master suite addition so it matches the existing house. I did the whole rear addition with 1 helper in a day, a big day though. It’s been pretty fun building this “new” addition in the “old” style.

It reminds me of the restoration/modified builds they do on old muscle cars these days. All old and original looking but with today’s advanced technology.

Get 50% Off By Haggling With Your Subcontractors

Get 50% Off By Haggling With Your Subcontractors

New Addition Framing

2.5 days and the whole master suite addition is all framed up and dried in. It came out sweet; I am really excited with the reconfigure of the floor plan on the Hat Trick House. I have the roofers coming tomorrow to put down a 30-year dimensional shingle in the color Estate Grey with ridge vents.

My electrician is also getting started in the a.m. roughing everything in for the complete re-wire. I am also planning to call for framing inspection tomorrow as well so let’s hope for a pass, should be no problems as I went with 2×8 for ceiling joists and 2×6 for the roof.

I had a bid yesterday for all new plumbing with permits including tying in the new room addition. This character had the nerve to bid $8,000. It’s really crazy now that construction has slowed down; some subs are actually raising their prices to make up for less work.

I had him down to $3,500 by the time we got outside to the curb. I’m still getting bids and trying to hit $2,500 max.