117 Siding and New Plumber

117 Siding and New Plumber

I started getting the siding on this week and have been interviewing new subcontractors for the 3 trades that will be next in line to rough-out the house. I love the historic style #117 wood siding, it gives my projects a real edge over the competition as most guys run HardiPlank on their additions. It cost a little more at about 45 cents a foot but well worth the price for my projects. Its always my goal also to find the best prices for any work that I have to hire out because it increases my net profit. A dollar saved is a dollar earned, right?  My DIY method of doing these rehabs does not involve hiring a general contractor who would tack at least 50%  profit right onto your cost but instead managing the subs personally and working right alongside them doing most of the work myself. This gives me the freedom to pick my own sub contractors and negotiate with them directly and pocket the savings.  As with many of the subs in the past, I started to experience “price creep” with my plumber on every house we did with him. With construction as slow as it is I cant justify paying a higher price for the same job so we give new hungry guys a shot.

Out of the 3 trades I always do the plumbing first, its hard pipe and cant move whereas the electrical and mechanical can work around anything. I accepted a bid from a plumber yesterday that I’m really excited about. He’s been is business over 25 years, does alot of new construction homes, comes highly recommended and has beat our last guys price substantially. We are getting a complete new plumbing system with “15 fixtures” including new pex supply lines all the way from the water meter,  new pvc drains all the way to the sewer and complete new black pipe hard gas lines from the gas meter throughout the house to 4 locations in order to qualify us for the “Smart Energy” title. Our local energy company CPS right now is really pushing awareness of using a combo of gas and electric to builders but we’ve of course always done this anyway. They designate your project a Smart Energy House, this combined with all the Energy Star appliances has been a real plus for our customers. His bid also includes supplying the hall bath tub and 50 gallon hot water heater. I am getting a 1 year warranty as well and he wont even let me touch the fixture installation to save money as he’s that concerned about his liability. The price is $5900 for the job where previously we were paying over $7000 and having to furnish the tub, heater and do the trim out myself so effectively I think I’ve shaved about $2000 of this one trade alone. I hope he works out, he is suppose to be all roughed in and topped out this week for an inspection.

The Neighbor’s House is under contract again as of last weekend. We are passed the home inspection and are expected to close at the end of the month. Additionally there is a back up offer in the lurch. I still will share all the juicy details from all the previous offers we received and deals that fell through but not until the sale closes. This house is incredible and someones going to be very happy to own it. What a great project and fun story!

Land Of Mañana

Land Of Mañana

Our great start is now officially over. It’s the “Land of Mañana” again here in good ole SA. Plagued with bad weather and sub-contractor delays we can’t proceed with the drywall until we pass these inspections. A whole week has gone by and I am still waiting for an inspection on electrical and re-inspection on HVAC. I’ve heard every excuse in the book, it comes down to the sub contractors taking on any work they get and dragging everybody out. With the slow construction season coming they won’t dare tell anyone “no” now. Once I pass these rough-in inspections the pace will pick back up as it will all be on my shoulders. I did manage to trim out the front porch while I was waiting for inspectors (who weren’t coming) so now the house is ready for some primer. My square tapered columns came out great as planned. Our architect came through with a rendering from which we made our yard sign in order to start our marketing campaign and hopefully avoid paying a realtor fee once again by procuring our own buyer.

 orch

Gettin’ there

Gettin’ there

The interior is nearing completion. I finished the trim carpentry this week, hanging doors for the pantry and laundry & putting in the kitchen baseboards to match the existing ones. Inside the kitchen pantry I made some custom shelves as well.

The baseboards are 1 x 8 pine with a shoe molding. All the original trims had to be sanded and primed with oil base, as they were originally oil-based paint. If you’ve ever tried to paint oil based trim in an old house with latex, you know how it will just peel right off.

I like the Zinnser oil based primer product better than Kilz. It’s extremely difficult to work with, you have to slop it on, move fast smoothing it out and don’t go back over old work.

All that’s left now are all the windows and casements which are extremely flaky, this is going to take a lot of prep work this week to smooth them out and get them in primer. I just passed the 8-week mark for this project, looks like about 1-2 more weeks and the inside will be done.

I’m still on track with the budget however I’m expecting to go a little over on landscaping and the rear deck. I’m not too worried though as the neighborhood comps are showing that my original sales target price was conservative a bit so I’ll list now for $19,000 higher than initially planned.