Framing and TV Deal

After some last minute on-the-fly floor plan changes Thursday night from our architect Morgan at Dewitt, we finally got our material delivery Friday afternoon and my new framing crew got started. We really cut it close as she actually showed up to the job site with the new plans just hours before the framing started. These guys are very detail oriented and even cheaper than my last guy so I’m pretty stoked I found them.

Framing in San Antonio goes for about $3.00-3.50 per square foot for new construction if you deal directly with a sub contractor, in case you are wondering we negotiated $2.71 per foot for this project. In a day and a half they got the floor system done and all the walls up, all that’s left for Monday are the ceiling joists, rafters and decking.

The master has a cathedral ceiling and we are also doing a double-sided gas fireplace between the spa tub and master bedroom which are both new for us so its exciting. I’ll get the roofers over as soon as framing is done so we’ll be all “dried in” and then i can get started on the siding myself.

A Major TV production company in Hollywood that does all the good reality shows on TLC Network and HGTV contacted us this week about doing a reality show about house flipping. They found out about us evidently through our YouTube channel and got to my website.

It would be real cool to get our own show but unfortunately they are looking for someone doing a minimum of 10 houses per year, probably so they can film enough episodes. Theres been a real lack of good flip shows on TV lately, we really enjoy Flipping Out because Jeff Lewis does the larger spec deals like us and Property Ladder was always good because Kirsten Kemp the host is great and they also featured such a wide variety of different investors from pro to novice.

As far as the new Flip This House crews, Rudy in LA isn’t really doing it for us and the New Haven crew seems to be more focused now on selling courses online like Montelongo. It’s pretty flattering nonetheless to get approached anyway, maybe there will be a Property Ladder episode in our future?

We are still getting good showings at The Neighbor’s House and I feel the Spring buyers are just now getting out there now that we have great weather. In San Antonio, sales are off 4% year to date when compared to last year and inventories are slowly rising this year by about 100 houses per month.

After a closer MLS search for our general area, its apparent that there are tons more sales that are AO (under contract) or Pending right now so this figure should be improving for March.

Target Framing plus…New Site Coming Soon

We had a really wet and dreary week but I still managed to squeak in some good showings at The Neighbor’s House and get started on the interior reframing of Target House.

I had initially wanted to jump straight into some work on the bobcat grading the backyard for the room addition but the weather just wasn’t on my side. It’s nice though to see the existing house all opened up and our floorplan changes really make the home modern and functional now.

It was a big deal for me to commit to not having arches throughout this project as I’ve become really attached to them as most of you know, but with the prominent existing built-in having a square cased out opening, the arches would have clashed majorly.

After framing up all the openings this week I am really feeling the square lines now, another good call from our architect, DeWitt. Our website is getting switched over to WordPress as we speak and will be a true blog and allow interaction with our visitors through RSS feeds, comments and also be way easier for me to do updates.

With a full work week and toddler it was getting really hard to keep up with our web updates so now this should make our (my wife’s) lives much easier. Stay tuned for the new site and more updates!

Milking the Clock

We had a big week 3 on the Neighbors House project. Monday I passed inspection for my foundation so we ordered materials and went straight into framing the master suite room addition Wednesday. When laying out the floor joists I had the option to grab an extra 15 square feet by not cutting down my 16 footers and additionally we cantilevered the sills out and ended up with extra footage along the rear thus making our addition just over 700 s.f. instead of the planned 620. The framers kicked ass and got it done in a day and a half. I also had the stucco guy do the column bases for the front porch during the week. For the roof I went with my favorite 30-year composite shingle but since there were “Estate Grey” roofs on either side of this house (one being Hat Trick House) I had to choose another color, Driftwood. It’s really bizarre to flip two houses right next door to each other. Not only will I get to use my sales comp but also get the carryover curb appeal. My roofers showed up Friday and really got off to a slow start, it’s really disappointing to see someone intentionally dragging something out. Turns out the workers were being paid a day rate instead of a contract rate. After turning up the heat on my subcontractor he quickly changed their pay scale to per square pricing and they really started working, it was like I was looking at a different crew. These clock milkers had the nerve to ask me to buy lunch for them Saturday, I told them where they could go… to find the closest taco shop. The roof didn’t get finished due to the time lost so they’ll be back Monday to wrap it up. This week I’ll take care of the interior framing and arched openings and then its time to run the sub contractors through there for HVAC, electrical and plumbing to work towards the big milestone of passing rough-in inspections on all 3 of these trades.

Week 2 Update Neighbors House

After completing the bulk of the demo last week my main goal has been towards getting the new roof on. I always start with the new roof first (and foundation if needed) on any major remodel so if there were any leaks previously it wont trash any new stuff going in. Before I can get the roof on this house, I have to add the porch and room addition so it’s been my main focus to get these taken care of first. I had to move the gas meter back 40 feet from the house but luckily the power company showed up Monday and obliged so I got started with no delay. The porch came out really good as it completely changed the look of our house. In this historic neighborhood everyone loves the big front porches and they are an important feature in order to maximize retail sales price. I mimicked the original house design with the 30” eaves and open rafter tails. There are about 10 different Craftsman style home models in our neighborhood but unfortunately this one doesn’t come with the traditional porch so we knew we had to add it. The rear addition is the major change of this house, it will be approximately 620 square feet and contain a utility room, master bedroom, master bath, hallway and walk in closet. Once again to obtain maximum retail sales price these are things that today’s buyer will expect. We will also be giving them a walk-in food pantry and double vanities in the bath, all popular amenities to consider when given the opportunity to remodel. I was fortunately able to design around the big pecan tree so after we are done I plan to do a cool deck around the tree with a circular bench and French doors leading from the master suite. We’ve gone through 6 dumpsters so far, 3 being filled with dirt from the excavation I had to do with the Bobcat for the addition. Monday I have an engineer inspecting my foundation and issuing a certificate, which the City of San Antonio requires for our permit and then we’ll be free to start framing. Do you want to learn exactly how someone pulled down $155,510 his first year Flipping Houses in a recession? Visit our friend’s blog and see. Congratulations bro!

Get 50% Off By Haggling With Your Subcontractors

Get 50% Off By Haggling With Your Subcontractors

New Addition Framing

2.5 days and the whole master suite addition is all framed up and dried in. It came out sweet; I am really excited with the reconfigure of the floor plan on the Hat Trick House. I have the roofers coming tomorrow to put down a 30-year dimensional shingle in the color Estate Grey with ridge vents.

My electrician is also getting started in the a.m. roughing everything in for the complete re-wire. I am also planning to call for framing inspection tomorrow as well so let’s hope for a pass, should be no problems as I went with 2×8 for ceiling joists and 2×6 for the roof.

I had a bid yesterday for all new plumbing with permits including tying in the new room addition. This character had the nerve to bid $8,000. It’s really crazy now that construction has slowed down; some subs are actually raising their prices to make up for less work.

I had him down to $3,500 by the time we got outside to the curb. I’m still getting bids and trying to hit $2,500 max.