Paint on the Lady

Paint on the Lady

The painters I hired for The Lady turned out to be a little in over their heads. Throughout the week I found myself initially letting some poor prep slide, then finally by the end of the week I was actually showing them how I wanted things done and had my hourly helper doing their work. Since we had agreed on a contract price and not hourly, I told them it just wasn’t working out and I wanted to break up.

The straw that broke the camels back is when I had my guy re-sand a whole wall because they didn’t prep it good enough and then before we could even put some primer on it, they sprayed color right over the raw wood. I feel much better now after letting them go, me and my guy will probably just finish it off ourselves.

The paint job is real important on this house and as you know its all in the prep, but even though I had not planned nor budgeted for the caliber of work we’ve done in the past, it still needed to be better than what I was getting.  This is the first sub contractor who hasn’t worked out so I’ve been really lucky getting back here to San Diego and having to build a new team and at least the error is on something I can fix.

I am super excited with my colors, the first one we put up after primer is the dark green on the big eaves. Victorian color schemes are known for dark eaves and trim and lighter body colors. The pictures are large format again so make sure and click on them if you want to zoom in: )

The second color we sprayed was on the gable shingles. This accent color will also be carried down to a few other spots later. Notice the ornamental rosette discs I found online to replace what must have been there originally. When we pulled the siding off last month I noticed these circle marks and figured out what had been there years ago. These little details are going to pop after all the colors are up. I’ve got one more period detail big surprise with the front porch handrail, the house is looking really good now but only half way to the impact I’ve got planned!

The drywall crew is doing a great job and should be finished in a few more days. The hand troweled smooth texture is coming out perfect so that’s my good news for the week. Here are a few pics before the texturing went on, the huge tray ceilings are really dramatic. I also went with the new style “mini-bullnose” for the corners, its smaller than your typical rounded corner but very sharp and clean and usually reserved for high end custom homes.

My plan is to keep pushing on the exterior so we can get all the colors up before coming back inside to do window trim, interior paint and flooring. We had a good home sale a few blocks over, its another historic 2 story rehab, 500 square feet smaller and only a 2 bedroom went pending after only 5 days on the market for $425k. We’ll have to see what it closes for but I’m sure they didn’t take too much less with that short market time. This Grant Hill project will be one of the nicest historic preservations in the area.

Drywall and Exterior Prep

Drywall and Exterior Prep

After having 6-7 drywall contractors bid the Painted Lady I finally pulled the trigger. With the lack of new housing starts in this town a lot of the high volume big specialty crews are not around anymore. Of course there are drywall “companies” here but they all charge more than I want to pay. Any handyman can hang your drywall so it can be tricky to get a good price yet also get a good job, its one of the most important things to get right in order to have a nice finished product.  We always say you can only get 2 out of 3;  fast, good and cheap. It might get done fast and be cheap but it wont be good. It might be good and cheap but it wont be fast. Lastly, it might get done fast and good but it certainly wont be cheap!

In searching for drywall sub contractors I relied on referrals primarily. In our business we always break costs down to price per square foot on anything in order to budget for things. In Texas everyone used a labor price per sheet which was around 11.00. Here in San Diego all the contractors are using price per square foot and quoting .45 to .65 cents for labor which includes hanging, tape an float and texture. Out of all the rehabbers and other investors I spoke to nobody knew how much they were paying but just agreeing on one price.  Things they take into consideration are the ceiling height and any other details that might slow them down. Our house has 11 foot ceilings with trays downstairs and coves upstairs so it adds a lot of time to the job. While a lot of bids came in at .59 cents I ended up getting it finally from a highly recommended guy for .40 cents. Another thing that’s driving my price up is because I am going with a smooth finish texture to replicate the old plaster found in these homes originally. A quick light orange peel spray job would have been way cheaper but I couldn’t do that to this house. At 10,000 s.f. of drywall I’m paying $4k for labor. I’m pretty happy, the hanging crew is done now after 2.5 days with 5 guys and we have the inspection on Monday for screw spacing then Tuesday we can start taping.

On the outside of the house I stayed busy with recreating some more of the missing details that make this house so cool while the painters started prepping. The biggest thing was that the sunburst under the front gable was broken so we had to scale a 32 foot ladder and take it down to copy it. I made a sweet new one and got it back up there in place, its weird to think that the last person who touched this was over 100 years ago and nobody will touch what we did for probably another hundred years. I’m putting in a little extra effort to make sure the front of this house and all its historical little ornaments are intact. We installed the TM Cobb Victorian front door with stained glass window and rebuilt the original transom as well. I also hand made some cool brackets for under the front porch. Since the original ones were missing I used the mini gable facia for inspiration and came up with a heart-Celtic-clover design, they came out cool and are now in place. Its neat when the sun hits the front of this house all these details create shadows on the siding. I also made some fake scalloped shingles for the top of the mini gable that were missing. I cut them out of 1/4 plywood and even put grooves in them to make them look real, another small detail that will pay off. We are getting color on the outside this week, stay tuned to see some Lady paint.

Siding and Insulation

Siding and Insulation

We finally passed all rough-in inspections and have now hung all the insulation. It took 2 tries with   my hvac sub contractor, he forgot to strap down the furnace and didn’t run hard pipe gas line through the unit so we had to call for a second inspection after having him come fix the two issues. These are small details which he should have caught but nonetheless we got all the signatures now on our inspection card and the City inspector is starting to warm up to me a bit now that he sees we know what we are doing. Right after passing I scheduled the insulation to be hung the next day and its called in for an inspection for tomorrow. I insulated the exterior walls and complete sub floor.  This is over and above what my permit called for but having all the walls opens provides such an obvious opportunity to save energy and provide someone with a product we can be proud of. I’m sure the new homeowner will unknowingly be thanking me every month when they pay their electric bill. With all the walls open I also ran Cat-6 and cable wires to all the bedrooms. We are in a heat wave right now in San Diego, I wouldn’t have wanted to be the guy under the house all day itching and scratching trying to hang this stuff. I jumped outside and started trimming out the exterior also, I re-framed the front porch and used 1×3 tongue and groove for the decking that’s historically correct. It’s a little more than I could have spent on another material but its details like this that will pay off in the end and especially since its on the front of the house which is always the most important to focus on.

I also got some of my windows installed and I’m telling you they are so neat. TM Cobb makes a mighty fine wooden double hung window for historic homes. I’m totally happy and cant wait for the missing 2 to arrive with the Victorian front door so I can install them too.

Here’s the bank of 4 windows on the study or optional 5th bedroom. This room is going to be killer with all the light that’s coming in. There was a lot of missing trim on the corners of the house that was probably removed when the metal siding went on. This stuff is easy to replace so we’ve been working our way around the house getting everything back to how it should be.

For the rear master suite room addition I purchased 10″ cedar beveled channel siding from La Mesa Lumber at $2.50/foot. This is the first time I’ve used it and boy is it nice. It comes pre-primed and its very straight, unlike the T117 siding I’ve frequently used on the Craftsman bungalows. We wrapped the room addition with Tyvek first of course and are now putting the 773 siding up. It’s great to use all the correct materials, in this case its costing me about $1400.00 for this siding but its going to be worth it. The historical review board here in San Diego wouldn’t even have let me use Hardi Siding if I wanted to. My colors were also approved this week so once the exterior trim and siding is all complete I’m going to have 2 crews in simultaneously painting the exterior of the house and hanging the drywall on the inside. Once the drywall is hung we have to get a nailing inspection where they verify spacing on the screws before we tape and float over it. Stay tuned, we’re going to see some dramatic changes soon. Also, Get on over to Biggerpockets.com and check out the video interview I did with Josh. I break down our business model and explain what kind of projects we look for.

Painted Lady has a New Hat

Painted Lady has a New Hat

This is the craziest roof I’ve ever done and it didn’t help that my roofer only saw it necessary to bring one helper. The pitch is a very steep 12′ on 10′ so it makes walking on it humanly impossible. Not to mention that there were 3 layers including the original wood cedar shake shingle that needed to be removed before we could even install the new roof decking made this an all consuming  job. It was slow going all week due to the steep pitch, they even had to hand carry the individual shingles up the 32′ ladder as we couldn’t load the bundles anywhere on the roof. It’s always good to pick your roof color to go with what exterior paint colors you’ve got planned, I can’t tell you how many times I’ve seen rehabbers make this crucial mistake, like a brown roof with a green house. I usually use the Owens Corning 30-Year Estate Grey but this time I went with something new its the Lifetime GAF shingle in the color called Slate. It’s mostly grey but with a hint of blueish green to make it look like slate on an old house. I think its going to tie in nicely with my paint color scheme. The roof on this house is real important to get right because its so visible. I took this opportunity to remake the historic scalloped decorative facia board also on the mini front gable and it came out sweet.

I also picked up my new wood historic style double-hung sashed windows by TM Cobb this week. These windows are so cool I wish I could replace all of them but the budget just doesn’t permit it. I’m putting in 8 new ones that are either unsavable or someone had already replaced with aluminum and refurbishing the rest of the original windows per the historic board guidelines. I cant put them in until I pass framing inspection. The electrician finished up this week so I’m now finally ready to call for rough-in inspections on framing, electrical, plumbing and hvac all at once. I think I’ve got 7 killer historic colors nailed down for the exterior, they are from the Sherman Williams Victorian House color collection. If the Historic Board approves it, I’ll be using a lighter green body, dark green trim, burnt orange accent on the sunburst, plum windows, medium orange for some accents, and light blue for the porch ceiling. There will also be a grey wood front porch to keep it period correct. These are some heavy colors but I think the Lady will hold them well as long as I use the accents sparingly and in the right places.

Hidden Surprises for Fathers Day

Hidden Surprises for Fathers Day

First and foremost, Happy Fathers Day to all the dads out there! The coolest thing we did this week at The Painted Lady was to remove all of the 1970’s Sears metal siding, of course we recycled it to help save the planet. This is the third time I’ve done this on a historic house but I’ve never removed 2 different layers to get down to the original wood. It’s always a gamble because you never know of the condition underneath but its been my experience that the asbestos or vinyl that’s on top actually preserves and protects the old wood and I’ve always been surprised to see near perfect siding with minimal paint jobs buried underneath. The more the homes get painted over the years, the harder it is to prep so in this case when I found the original yellow paint job with nothing cracking or peeling I was excited.  As we removed it, I found tons more hidden architectural details that these Victorian houses are famous for so I had to tell myself it must have been a pretty good salesman in a polyester jacket who was able to convince the homeowner with his “never paint your house again” pitch years ago to cover all the character of their house up. These cool details in the trim on the house are going to put my paint job over the top.

We also finally got the foundation poured, it took 2 full trucks with almost 20 yards of concrete total, as well as a pumper rig to fill up the spaces we left open around the house in the forms. Once filled we removed the forms while it was still green and hand troweled the finish. Its harder to work with but I used the 1.5″ rock aggregate although most guys use the pea gravel mix. Since the stem wall is 3 feet high in some spots I wanted it to be as strong as possible. This house isn’t going anywhere now for another 100 years. The Historical Review Board also asked me to replace the visable portions of the old chimneys in order to keep the house period correct. The old ones were crumbling and dangerous and I deleted them from inside the house to maximize my floorspace and intended not to re stack the exterior, they weren’t fireplaces inside but only basically a brick flue for stove exhaust. I found some used bricks on Craigslist and had them re-stacked just from the roof line up, I had to knock this out before the roofers show up on Monday.

I finally met with some sub contractor drama this week from one of my subs, I knew everything was going too good to be true. It’s crazy, but unfortunately I cant share the story although it involves the FBI. Hopefully he’ll have his helper finish up next week so I can call for rough in inspection and be ready to insulate and drywall after the new roof goes on.