Master Sweet Framing

Master Sweet Framing

I’m getting close to the stem wall pour, the guys worked on the forms all week. Inside the forms we hung 12″ j-bolts that will anchor the house to the foundation once it’s poured. Then we laid 4 rows of #5 rebar and secured it to the screw jacks with tie wire. Anywhere the stem wall is more than 24″ high we will hang vertical rebar 24″ on center as well. This is over and above local building codes but  worth the extra expense. All the load from the weight of a house is carried on the exterior walls and down to the footings, it’s totally different for me here doing this as in Texas when building a pier and beam room addition you don’t do this perimeter foundation. The plastic sheeting you see is to keep the concrete from blowing out the back once we pump it into the form cavity. All that’s left now is to set the outside forms, we’ll cut windows along the top of the outside so we can pump the concrete in.

I also got the new master suite all framed up, it’s 375 s.f. and includes 9′ ceilings, a big bathroom that fits dual vanities, soaker tub, stand up shower and water closet. There’s also a generous sized walk in closet and french doors off the back. While the framers were there I also had them raise the kitchen ceiling, move some closets around upstairs and add some really cool tray ceilings in the living room and dining room that I’ll use for my mechanicals and central heat ducting to get upstairs. We also added fire blocking to the entire house since I had all the walls open. I bumped up the room addition ceiling  joist size to 2×8 and the roof rafters to 2×10 just to ensure the inspector likes what he sees and I get off on the right foot with him. It’s coming out pretty trick, I’m excited about how easy it was to really modernize this 100-year-old floor plan and am confident it’s going to help sell the house. The prices I’m nailing down for mechanicals on this 2000 s.f. house so far are as follows: Complete electrical with new 200 amp service: $5300. Complete plumbing with copper supply, gas lines and all new ABS waste lines: $5000. Complete new central heat system with new furnace and ducting: $1800. New roof: $2000 labor.  These are killer prices and all from legal, licensed sub contractors, I couldn’t have done better in Texas. Thanks to everyone locally who has sent me referrals, after this huge project I’ll have a great team ready for any size project!

Skinny legs, old yellow dress

Skinny legs, old yellow dress

So we finally got started this week on the huge foundation repair in which we are completely leveling the house and adding a new perimeter concrete stem wall. Before this huge stem wall can be formed and poured, we had to level the house and dig the 24″ trench around the sides. The house was only 2″ off at the most so the leveling was easy and we got the entire house within 1/4″ with a digital level going from one side to the other.  I hired a foundation guy who has worked for me in the past even though I had a cheaper bid from a new guy, I just felt it’s such an important part of the rehab and I didn’t want to go down that road with a new sub contractor, especially on my first project back in San Diego. The only downside was I had to wait for him to finish another job so it slowed me down a bit. I’m not sure that I would have wanted to be under this huge house with jacks on a Friday the 13th! The next step now will be to set all the wood forms for the stem wall and tie all the rebar inside per building code.

My sub contractor has been doing foundations for over 25 years so he’s got cool little tricks to make things easier for himself. I always enjoy learning these little tidbits from a true experienced professional in their field. As you can see here he’s got the outside of my house sitting on “sacrificial homemade screw jacks” we made out of 3/4″ galvanized pipe with 5/8″ all-thread inside and nuts and washers for the adjustments. Once everything is level he uses these jacks to hang the rebar on, and they’ll actually remain inside the new 8″ wide concrete stem wall permanently. Inside the trench they are sitting on small 8″ pier blocks, additionally he’ll hang the j-bolts from the new treated bottom plates so the house will be anchored to the new stem wall once its poured. It’s looks crazy to see this huge, heavy house sitting on these skinny legs but most of the weight is actually on the beams underneath a short distance away. Hopefully by the end of this week we’ll have the forms built and new foundation poured so we can get on to the framing.  After the framing I’ll do the roof, plumbing, hvac and electric. Everyone is ready to go for these trades so stay tuned as things shall move along a little faster soon. I pulled off some of the Sears metal siding that’s probably been on the house since the 70’s and as I guessed, the original 1909 ship lap wood was in perfect preserved condition with only one coat of faded yellow paint.  I’m pretty stoked as this could have gone either way with what I was going to find under there. On a side note, I had to rent a temporary construction fence this week to keep out the local kids who’ve evidently adopted the house as their local hang out at night. Every morning I’ve arrived to small surprises such as spilled ice cream, candy and even an egging. While nothings been stolen, construction sites are just not safe places to play so for the first time I’ve had to go on total lock down. This flimsy fence wouldn’t have kept me out 30 years ago but it gives me a little more piece of mind now knowing it’s not wide open.

Hammer Time

Victorian House Remodel San Diego

Feels great to be back doing what I love, creating new spaces, and most of all home in San Diego. We spent all week doing demo on The Painted Lady, with 3 laborers I gutted just about the entire house, maybe only a half day left and we’ll be done. I filled nearly (3) 40-yard roll off dumpsters at $427.00 each. I was really worried that we weren’t going to be able to get the dumpsters into the back yard, having to put them on a public street is a pain in the butt as you have to have a permit. My only other choice was paying someone with a dump truck to drive the loads to the dump one by one. This would have been very time consuming and costly.

The house is huge inside, I am really excited and can see the final product already. Next up on deck after the demo is done is the foundation work, then I’ll be ready to re-frame the back of the house and put the new roof on. So far it seems sub contractor prices are not that much higher than I was paying in Texas, although I still haven’t nailed down a good electrical or plumbing contractor. Here’s a walk through video so you can see this great floor plan.

 

New Project – The Painted Lady

New Project – The Painted Lady

74 days after arriving home in sunny San Diego we’ve finally bought our first rehab project, The Painted Lady. I’m real excited about it, she’s a 1909 Folk Victorian Gingerbread. The house is located in an Urban Redevelopment neighborhood just 1 mile from Petco Park and Downtown, with incredible views of the Coronado Bridge and all the way to Tijuana.

There are original hardwood floors under the carpet, 10 foot ceilings, and a lot of original details still intact. This is a huge project and needs just about everything a rehab could require. I’ll be leveling the foundation by adding a new perimeter stem wall and 40 new footings, new roof, re-framing a 360 square foot master suite on the back, replacing all the mechanicals, new kitchen, 2.5 new baths including adding a half bath under the staircase, some new windows and complete landscaping and fencing with an automatic gate on the alley. The house has aluminum siding that’s probably been on there since the 70’s. I peeked underneath it and there’s fiber shingles probably from the 50-60’s . Under the shingles I found the original wood board and bat siding which I’ll expose and also add some of the missing period details like the gingerbread ornamentation and porch decoration the Victorians are famous for.

The Victorian era began in the 1830’s and ran until roughly 1940. Our house is a Folk Victorian, more simple in design than the ornate Gothic or Italianate Victorians, and was usually built more modestly for the middle class. I’m excited to see the scalloped shingles under the gables which I’ll paint multi-color and the decorative gable bracket. This architecture can really hold color well so I’m planning on using a minimum of 6 bold colors to bring her back to life. I’ve done a lot of Craftsman style houses but this will be my first Victorian and only the second 2-story house we’ve rehabbed. With the huge scope of this project it will be a perfect welcome home project and enable me to become reacquainted with the City permitting, historical and inspection departments this summer as well as dial in my sub contractor team. If you can’t see the potential in what we have here, Google “Painted Ladies San Francisco” and you can get an idea of where I’m going with this project. Stay tuned for demo and a walk through design video!